top of page

Projects

    Flybe Academy (Exeter)   

This is Flybe Training Academy is located at Exeter International Airport. The new modern, international facility includes a flight simulator complex, Cabin Door trainer, 26 purpose-built classrooms and an integrated Apprentice workshop allowing Flybe to offer an increased range of training to third party customers worldwide. T.E.S.A.Electrical Services Ltd installed the BMS control system consisting of:

 

  • Heating in all areas

  • Individual Classroom Heating and ventilation controls

  • Ventilation in large training rooms

  • Metering all electrical usage

  • Combined Heat and Power (CHP) controls

Holiday Inn Express (Dunstable)

This is Holiday Inn express is located on London Road Dunstable Bedfordshire. The new modern building has 120 bedrooms and has 4 purpose built meeting rooms on site. T.E.S.A. Electrical Services Ltd installed the BMS control system consisting of:

 

  • Heating controls in all areas

  • Hot water controls for the complete building

  • Heating and cooling Ventilation controls in All areas

  • Kitchen Gas proving system

 

 

 

 

Knightstone office (Weston-Super-Mare)  

This is the Knightstone Housing Association New office located on the Weston Gateway Business Park in Worle, Weston-super-Mare. the 40,000sq ft building will become home to hundreds of Knightstone staff currently spread around six other offices T.E.S.A. Electrical services Ltd Installed a full BMS System Consisting of:

 

  • Heating in all areas

  • Hot Water in toilet areas

  • Chilled Water for ventilation

  • Heating and cooling ventilation

  • Metering all water/heating and electrical usage

Kingswood Civic Centre (Bristol) 

This is Kingswood civic centre and Kingswood Locality Hub it is located on the high street in Kingswood.This project consists of the refurbishment of an existing Civic Centre building and construction of a new Locality Hub in Kingswood, Bristol. T.E.S.A. Electrical Services Ltd installed the BMS control system in both buildings consisting of:

 

  • Heating controls in all areas in both buildings

  • Hot water controls for both of the buildings

  • Heating Ventilation controls in All areas

  • Metering of all electrical usage in both buildings

bottom of page